Sal Chemical Garage/Warehouse

  • Slideshow Image 1
  • Slideshow Image 2
  • Slideshow Image 3

Design-Build by JD&E

JD&E completed engineering, design and construction of a new 26,000 SF shipping and receiving building with 11 loading docks and mechanical levelers, locker rooms, office space and design for future mezzanine offices.