Hancock Co. Chrysler

  • Slideshow Image 1
  • Slideshow Image 2
  • Slideshow Image 3
  • Slideshow Image 4
  • Slideshow Image 5
  • Slideshow Image 6
  • Slideshow Image 7
  • Slideshow Image 8
  • Slideshow Image 9
  • Slideshow Image 10

This design/build project included installation and maintenance of erosion and soil controls; strip and stockpile 4,000 CY of topsoil; cut/fill approximately 35,000 CY of soil with excess being hauled off-site; installation of site storm sewer, sanitary sewer, waterline and electrical conduits; construction of site retention pond and outlet structure; fine grade with GPS approximately 24,000 SY of area; installation of 98 12” dia. X 35’ deep augercast piles; excavate, form and pour all pile caps and grade beams.