CCHS Multipurpose Room

  • Slideshow Image 1
  • Slideshow Image 2

This project consisted of a major renovation to the High School including all new acoustical treatments and finishes for a Band Room, an extension of the existing Stage area, complete renovation of the entire Multipurpose Area/Dining Area, including new equipment and serving lines and new restrooms at the lower level.  All of the work was completed on a fast track basis over the summer prior to the students going back to school.