Sal Chemical, Inc.

  • Slideshow Image 1
  • Slideshow Image 2
  • Slideshow Image 3

JD&E performed complete engineering, design and construction of a new 26,000 SF shipping and receiving building with 11 loading docks and mechanical levelers, locker rooms, office space and design for future mezzanine for offices.